Notice is given that Bath and North East Somerset Council in exercise of its powers under section 16A of the Road Traffic Regulation Act 1984 has made an order to the effect of which will be to temporarily introduce a road closure in that length of roads as detailed in Schedule 1 (columns 1 and 2) during the operative times stated in column 3, to temporarily introduce footpath closures in that length of roads as detailed in Schedule 2 (columns 1 and 2) during the operative times stated in column 3.


 


This order is required to facilitate the filming of Bridgerton and shall be operative from the dates/times listed in schedule 1 and 2 (column 3)


 


ALTERNATIVE ROUTES IF AVAILABLE TO BE SIGNED ON SITE.


 


Applicant details: Jade Robertson,


Sunken Garden Productions LTD


Email: jadetamzin81@gmail.com


 


Dated:  13th September 2019


 


Bath and North East Somerset Council


Traffic Regulation Order Team


Lewis House


Manvers Street


Bath


BA1 1JG


 


 


 


 


Kelvin Packer


Highways and Traffic


Group Manager



Schedule 1 Road Closures



 




Column 1


Column 2


Column 3


Abbey Green, Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


Abbey Gate Street, Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


York Street, Bath


From its junction with Stall Street to its junction with Abbey Street


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


Beauford Square, Bath


Entire Length


From 00.00 Tuesday 24th Sep – 18:00 Thursday 26th September


Royal Crescent Bath


From a point outside number 16 to a point outside number 1


From 00.00 Tuesday 24th Sep – 23:59 Thursday 26th September.



 



Schedule 2 Footpath Closures



 




Column 1


Column 2


Column 3


Abbey Green, Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


Abbey Gate Street, Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


York Street, Bath


From its junction with Stall Street to its junction with Abbey Street


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


North Parade Buildings, Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


North Parade Passage, Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


Upper Church Street,  Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


Abbey Street, Bath


Entire Length


From 00:00  Tuesday 24th September – 23.59 Friday 27th September


Beauford Square, Bath


Entire Length


From 00.00 Tuesday 24th Sep – 18:00 Thursday 26th September


Royal Crescent Bath


From a point outside number 16 to a point outside number 1


From 00.00 Tuesday 24th Sep – 23:59 Thursday 26th September



Your rating: 

No votes yet
To prevent automated spam submissions leave this field empty.