Notice is hereby given that the Bath and North East Somerset Council in pursuance of the provisions of section 14 of the Road Traffic Regulation Act 1984 intends to make an order of the effect of which will be to prohibit temporarily to vehicles in the lengths of roads specified in the attached schedules 1, 2, 3.


 

 


This order is required because of the likelihood of danger to the public, or of serious damage to the Cleveland Bridge and will be operative from Monday 3rd February 2020 for a maximum period of 18 Months.


 


ALTERNATIVE ROUTES


 


Diversion route for vehicles over 18 tonnes:


 


To & from the west of Bath: A36 from city centre to junction with A4 (Twerton Fork); A4 to junction with A4174 Ring Road (Hicks Gate); A4174 to junction with A420 (Warmley); A420 to junction with A46 (Cold Ashton).


 


To & from east of Bath: A4 from city centre to junction with A46; A4 to junction with A350 (Chippenham); A350 to junction with A36 (Warminster)


 


 


 


 


Applicant details: Paul Garrod, B&NES


Telephone details: 01225 394336

 


 

 

 


Dated:  16th January 2020


Traffic Management Team


Lewis House


Manvers Street,
Bath


BA1 1JG


Kelvin Packer


Group Manager


                                Highways and Traffic

 


 



Schedule 1 – Prohibition of Motor Vehicles over 18 tonnes maximum gross weight

 


1)     Bathwick Street & Cleveland Place


From its junction with St Johns Road in a north-west direction including  Cleveland Bridge to a point 70 Metres south east of its junction with London Road.


Schedule 2 – Prohibition of Heavy Commercial Vehicles over 7.5 tonnes maximum gross weight (except for loading)

 


1)     Upper Bristol Road,


Between its junctions with Windsor Bridge and Monmouth Place


2)     Monmouth Place


Its entire length


3)     Charlotte Street


Its entire length


4)     Queen Square Place


Its entire lengh


 


5)     Queen Square


 


Its entire length


6)     Gay Street


 


Its entire length


7)     George Street


 


Its entire length


8)     Paragon


Its entire length


9)     London Street


Its entire length


10)  London Road


Between its junction with London Street and Cleveland Place


11)  Chapel Row


Its entire length


12)  Charles Street


Its entire length


13)  Green Park Road


Its entire length


14)  Midland Bridge Road


Its entire length


15)  Corn Street


Its entire length


16)  Ambury


Its entire length


17)  Broad Quay


Its entire length


18)  Churchill Bridge


Its entire length


19)  North Parade


Its entire length


20)  North Parade Road


Its entire length


21)  Pierrepont Street


Its entire length


22)  Manvers Street


Its entire length


23)  Dorchester Street


Its entire length


24)  Great Pulteney Street


Its entire length


25)  Milsom Street


Its entire length


26)  New Bond Street


Its entire length


27)  Broad Street


Its entire length


28)  Northgate Street


Its entire length


29)  High Street


Its entire length


30)  Bridge Street


Its entire length


31)  Grand Parade


Its entire length


32)  Walcot Street


Its entire length


33)  St James Parade


Its entire length


34)  James Street West


Its entire length


35)  Monmouth Street


Its entire length


36)  Westgate Buildings


Its entire length

 

 

 





 


 


 


Schedule 3 – Temporary suspension of the following roads from Schedule Part II of the (Various Road Bath) (Prohibition of Use by Heavy Commercial Vehicles of Over 7.5 Tonnes Maximum Gross Weight) Order 2003

 


1)     Upper Bristol Road


from its junction with Windsor Bridge Road to its junction with Charlotte Street


2)     Charles Street


Its entire length


3)     London Road


from its junction with Nelson Place to its junction with Cleveland Place West


4)     George Street


Its entire length



Your rating: 

Your rating: None Average: 2.3 (3 votes)
To prevent automated spam submissions leave this field empty.