Bath and North East Somerset

 Archive

Online services and information for you
 Home | Archive Introduction | Related Local Plan Information
Links

 

B&NES Local Plan Revised Deposit - contents

Contents Page

 

 

Local Plan - List of Revisions

BATH & NORTH EAST SOMERSET LOCAL PLAN

INCLUDING MINERALS & WASTE POLICIES

REVISED DEPOSIT DRAFT 2003

CHAPTER D3: WALKING & CYCLING


LOCAL PLAN REF. NO.

REV.

NO.

SOURCE OF REVISION

REVISION(S)

Policy

T.4

T.4/A

120/B25, 5010/B85

The Council will safeguard, enhance and, especially in conjunction with new development seek the extension of, a network of safe and convenient pedestrian routes.

Para

D3.5

D3.5/A

Editorial change

Amend reference from ‘B&NES’ to ‘Bath & North East Somerset’

Para

D3.6

 

 

 

 

D3.6/A

 

 

 

 

3094/B1, 5008/B7, 246/B6

Development of the Council's Cycling Strategy was continued with the publication of a draft Strategic Cycling Network in August 2000. This includes both existing and proposed cycle routes in both urban and rural areas, some of which form part of the National Cycle Network. The main components of this network are shown on the Proposals Map and are safeguarded by Policy T7 in Diagram 18. Where use is made of former railway lines these routes are protected for sustainable transport under Policy T.9. Other main links are also shown on the Proposals Map and are safeguarded by Policy T.7. The national and local cycle network includes a range of routes, for example the Chew Valley Trail, which are actively promoted by the Council.

Policy

T.5

T.5/A

5010/B86

The Council will whenever possible provide, seek the provision of or seek funding for facilities which will encourage cycling as a means of travel in association with transport and development proposals.

Policy

T.6

T.6/A

505/B86

Development will only be permitted if provision is made for secure cycle parking in accordance with the standards set out in the schedule attached to this policy.

Schedule to Policy T.6 and T.26

T.6/B

3126/B26

SCHEDULE TO POLICIES T.6 AND T.26

NATIONAL MAXIMUM PARKING STANDARDS

USE

NATIONAL MAXIMUM PARKING STANDARD

1 space per square metre (m2) of gross floorspace unless otherwise stated

THRESHOLD FROM AND ABOVE WHICH STANDARD APPLIES

(gross floorspace)

Food retail

1 space per 14 sq.m.

1000 sq.m.

Non food retail

1 space per 20 sq.m.

1000 sq.m.

Cinemas and conference facilities

1 space per 5 seats

1000 sq.m.

D2 (other than cinemas, conference and stadia)

1 space per 22 sq.m.

1000 sq.m.

B1 including offices

1 space per 30 sq.m.

2500 sq.m.

Higher and further education

1 space per 2 staff + 1 space per 15 students

(see note 1)

2500 sq.m.

Stadia

1 space per 15 seats

(see note 2)

1500 seats

NOTES:

1. The standard for students relates to the total number of students attending an educational establishment, rather than full-time equivalent figures.

2. For stadia, sufficient coach parking should be provided to the satisfaction of the local authority and treated separately from car parking. Coach parking should be designed and managed so that it will not be used for car parking.

3. Parking for disabled people should be additional to the maximum parking standards. Development proposals should provide adequate parking for disabled motorists, in terms of numbers and design (see Traffic Advice Leaflet 5/95, Parking for Disabled People).

Policy T.7

PM Inset 23

T.7/A

Editorial

Delete cycle routes to east of Camerton where it duplicates new Sustainable Transport Route.

Policy T.7

PM Inset East

T.7/B

Editorial

Delete Cycle routes from Combe Hay and Shoscombe to Midford where there is overlap or duplication of routes with the new Sustainable Transport Routes.

Policy T.7

PM Inset Central

T.7/C

Editorial

Delete Cycle Route where overlaps or duplicates routes of new Sustainable Transport Route;

  • from former railway line between Old Mills & Hallatrow
  • between Camerton & Combe Hay

Policy T.7

PM Inset West

T.7/D

1943/B1, 731/B14

Delete cycle route east of Chew Valley Lake and amend error in cycle route south of Chew Valley Lake.

Policy T.7

PM Inset 8

T.7/E

1943/B1, 731/B14

Delete Cycle Route east of Chew Valley Lake

Policy T.7

PM Inset 10

T.7/F

Editorial

Add Cycle Route north & south of Whitchurch village.

Policy T.7

PM Inset 11

T.7/G

Editorial

Delete Cycle Route from Bitton-Bath former railway line where it overlaps with new Sustainable Transport Route

 

T.7/H

5001/B74

Add Cycle Route through Keynsham from Wellsway to district boundary with Bristol at the A4.

Policy T.7

PM Inset 11a

T.7/I

5001/B74

Add Cycle Route through Keynsham along B3116 & A4175.

Policy T.7

PM Inset 11b

T.7/J

Editorial

Delete Cycle Route along Bath-Bitton former railway line where it overlaps with new Sustainable Transport Route.

Policy T.7

PM Inset 12

T.7/K

Editorial

Delete Policy T.7 from former railway line where it overlaps with new Sustainable Transport Route.

 

Add Policy T.7 to link Policy T.9 sections on Station Approach

Policy T.7

PM Inset 15

T.7/L

Editorial

Delete Cycle Route where it overlaps with new Sustainable Transport Route.

 

Policy T.7

PM Inset 16

T.7/M

Editorial

Delete Cycle Route from former railway line north east of Hallatrow where it overlaps with new Sustainable Transport Route

Add Policy T.7 west of Station House.

Policy T.7

PM Inset 19

T.7/N

Editorial

Delete Cycle Route from former railway lines where overlaps with new Sustainable Transport Route;

- Old Mills to Paglynch Farm, Shoscombe,

- Radstock inset (19B) southwards to District boundary on line to Frome and

- Hallatrow to Camerton.

Policy T.7

PM Inset 19b

T.7/O

Editorial

Delete Cycle Route from former railway line north of Tom Huyton Memorial Park where route is duplicated by new Sustainable Transport Route.

Add Cycle Route between Waterloo Road & Frome Road

Policy T.7

PM Inset 23

T.7/P

Editorial

Delete Cycle Route from Bridge Place Road eastwards where the route is duplicated by the new Sustainable Transport Route.

Policy T.7

PM Inset 26

T.7/Q

Editorial

Delete Cycle Route through Carlingcott where the route is duplicated by the new Sustainable Transport Route.

Policy T.7

PM Inset 31

T.7/R

2999/B3, 3265/B1

Add Cycle Route linking Combe Down and the University.

Policy T.7

PM Inset 31d

T.7/S

2854/B1

Amend Cycle Route running in western part of village.

Policy T.7

PM Inset 32

T.7/T

Editorial

Delete Cycle Route through village where it is duplicated by new Sustainable Transport Route.

 

Add new Diagram 18 : Strategic Cycle Routes

Add new Diagram 18 : Strategic Cycle Routes

Contents page

 

 

* © Bath & North East Somerset Council 2004. Please read our disclaimer and privacy statement Link to Directgov ­ widest range of government information and services online* * Valid HTML 4.01!*