Bus operators are required to give eight weeks notice to the
Traffic Commissioner and the Council of any changes to the routes
or timetables of their services. However, under certain
circumstances, the Traffic Commissioner may permit changes at short
notice. The changes listed below have been notified to the Council.
Normally, timetable information is available from Traveline two
weeks before the date of changes.
Please note that operators of commercial services are free to
change them without consultation.
The right-hand column shows the instigator of the change:
O – Change to commercial service instigated by operator
C – Change to contracted service instigated by the Council that
administers it
Arrangements for local bus services in Bath & North
East Somerset over the Christmas and New Year Period
|
Monday 24 December |
|
Normal Service |
|
Christmas Day 25 December |
|
NO SERVICE |
|
Boxing Day 26 December |
|
NO SERVICE |
|
Thursday 27 December
&
Friday 28 December |
|
Saturday timetables on all services operated by First except
that the 379 will run to normal Monday to Friday timetables and an
additional 178 journey will run at 17:26 from Bristol to
Radstock.
Bath Park & Ride Services 21, 31, 41 and 42 will run to
normal timetables; the University Park & Ride 19 will not be
running during this period.
Service 14 (Faresaver) will run to a reduced timetable. Service
185 (Somerbus) will not run. Service 349 (Abus) will run to a
Saturday timetable. |
|
Saturday 29 December |
|
Normal Service |
|
Sunday 30 December |
|
Normal Service |
|
Monday 31
December |
|
Saturday timetables on all services operated by First except
that the 379 will run to normal Monday to Friday timetables and an
additional 178 journey will run at 17:26 from Bristol to
Radstock.
Bath Park & Ride Services 21, 31, 41 and 42 will run to
normal timetables; the University Park & Ride 19 will not be
running during this period.
Service 14 (Faresaver) will run to a reduced timetable. Service
185 (Somerbus) will not run. Service 349 (Abus) will run to a
Saturday timetable. |
|
New Years Day
1 January |
|
Normal Bank Holiday Service |
|
Wednesday 2 January |
|
Normal Service |
Forthcoming changes to local bus services in Bath & North
East Somerset
Starting 02 January 2008
|
Service
Number |
Operator |
Change |
|
970 |
Faresaver |
Withdrawn |
Starting 06 January 2008
|
Service
Number |
Operator |
Change |
| 13D |
First |
Journey advanced by 10 minutes |
| 264.265 |
First |
New services replacing services X4 and X5 between Bath and
Warminster/Westbury. |
|
532.533 |
Buglers |
Change of operator from Wessex Connect to Buglers. |
|
|
535 |
Severnside Transport |
Withdrawn |
|
684 |
Faresaver |
Change of operator from Severnside Transport to
Faresaver. |
|
X31 |
Faresaver |
Timetable revised |
Starting 21 January 2008
|
Service
Number |
Operator |
Change |
|
14 |
Faresaver |
Timetable revised |
|
265 |
Faresaver |
Timetable revised |
|
272 |
Faresaver |
Timetable revised |
Starting 28 January 2008
|
Service
Number |
Operator |
Change |
|
X73 |
Faresaver |
Timetable revised |
|
X86 |
Faresaver |
Timetable revised |