Contact:
  • Council Connect
  • Address:
    Floor 2 East, Riverside, Temple Street, Keynsham, Bristol, BS31 1LA
  • E-mail:
    CouncilConnect@bathnes.gov.uk
  • Telephone:
    (01225) 394041
  • Fax:
    (01225) 394338
  • Minicom:
    (01225) 394166
  • Page Updated:
    27/11/2008
  • Author:
    Geraldine Kinsella
A to Z Index
Related Documents

Resurfacing - all sites (WARNING PDF - 4,410kb) Resurfacing - all sites (WARNING PDF - 4,410kb)

For help on viewing Related Documents please refer to the Help page

My Area...


Subscribe to Inform news icon

and get local news for free.

Carriageway Resurfacing

 August, September, October and November 2008

Resurfacing in Bath City Centre

Carriageway Resurfacing - Various Locations throughout the Authority.

Between August and November 2008 Bath & North East Somerset Council awarded three Carriageway Resurfacing Contracts - The North Contract, The Bath City Contract and The South Contract.

The North contract sites as shown below have now been completed. The Bath City Contract sites: Argyle Street/Grove Street, Guinea Lane, St. Mark's Road and Catherine Way have been completed. However, for information regarding Eastfield Avenue please see paragraph below. The South Contract sites: School Lane, Chew Stoke; Bonhill Road/Bonhill Lane, Bishop Sutton;  Fox Hill, Combe Down; B3115 Tunley Road, Tunley and Bristol Road, Paulton have been completed. However the Engineers responsible for the carriageway resurfacing on the South Contract sites are aware of some surface material failure. Consequently the contractors will be responsible for carrying out all of the remedial works at their expense.

Additional carriageway resurfacing sites will be added to this list at a later date.

There were unexpected drainage problems at Catherine Way, Batheaston which in turn deferred the surfacing works at Eastfield Avenue, Weston.  We apologise for the inconvenience these events caused both to local residents at Catherine Way and bus passengers in that area who were affected by the necessary change to bus routes and schedules.

As a result of the delayed resurfacing at Catherine Way, notification was received at short notice from the nominated subcontractor of the shut-down to their surfacing operations for the winter due to the recently experienced adverse weather conditions.

The specialist surfacing process selected for Eastfield Avenue, being a seasonal operation, will not be able to commence until around next March. The carriageway preparatory works however have been completed along Eastfield Avenue in readiness for the forthcoming resurfacing works. We apologise for any inconvenience that the road works carried out to date at this location may have caused and we will ensure that a further advisory letter is provided in advance and nearer to the time of the carriageway resurfacing works at Eastfield Avenue.

At each location, prior to the commencement of works, driver information boards will be displayed advising the precise works dates and times. It should be noted that any dates and times advertised may be subject to change due to adverse weather conditions or other unforeseen circumstances.

Any constructive comments, or concerns, are welcome as we continually strive to improve our methods of working and public relations. These comments can be sent by email to Transportation@bathnes.gov.uk, or by a phone call to Council Connect on 01225 394 041, (in each case asking for the information to be forwarded to the Highways Design Team).

Updates will be posted on this web site. If you would like more information regarding the Carriageway Resurfacing please email: transportation@bathnes.gov.uk or call Council Connect of 01225 394 041.

 

 

Diversion signs will be in place when temporary road closures

are implemented during the carriageway resurfacing

North Contract
Carriageway Resurfacing Site Location Approximate extents of carriageway resurfacing site. Works Start Date (2008) Approx. number of days Site Working/ temporary road closure hours
Stockwood Lane Whitchurch Completed    
Staunton Lane  Whitchurch   Completed    
Woollard Lane Whitchurch Completed
Norton Lane / Maesknoll Lane  Whitchurch / Norton Malreward Completed
Church Road Norton Malreward Completed
B3130 Stanton Road Belluton, Pensford Completed
Park Road Keynsham Completed
Kelston Road Keynsham Completed
Hawthorns Lane, Keynsham Completed
Leys Drive (garage-way access opposite no. 64) Keynsham Completed
Bath City Contract
Catherine Way Batheaston

Completed

St Mark's Road Widcombe  Completed  
Guinea Lane Bath Centre  Completed  
Argyle Street/Grove Street Bath Centre Completed  
Eastfield Avenue Weston For its full length but not including the north western loop, (ie. adjacent to House numbers 2 to 44 Eastfield Avenue) Please see explanation for deferment of these works above. Planned for spring time in 2009.  
South Contract      
School Lane Chew Stoke

Completed

 Completed  
Bonhill Road / Bonhill Lane Bishop Sutton

Completed 

 Completed  
B3115 Tunley Road (and a section of Palmers Road) Tunley

Completed

 Completed

 

Fox Hill Combe Down

Completed

   
Bristol Road Paulton

Completed