Bath & North East Somerset Council Corporate Plan
2008-2011
1. Executive Summary
This document is the Bath & North East
Somerset Council Corporate Plan which sets out our priorities for
the next three years. The Corporate Plan will build on past success
- which has led to the Council being rated by the Audit Commission
as “a three star” local authority which is “improving well.”
We are also seeing increasing levels of satisfaction from the local
communities we serve, as evidenced by the recent resident’s survey
undertaken by the Council. (Voicebox)
The Corporate Plan sets out the improvement priorities for the
Council and priority actions to address them over the coming
years. The improvement priorities are also supported by the
findings of the recent Voicebox survey, which showed the level of
affordable housing and traffic congestion as areas of key concern
for the general public, as well as concerns over road and pavement
repairs, crime and public transport.
It is recognised that Bath & North East Somerset is at a
critical stage in its development, with a number of challenges
around affordable housing, a low wage economy and high levels of
congestion. There is a need for substantial investment and a
co-ordinated approach both across the Council and the sub-region to
tackling these issues. The area is also set to experience
substantial growth over the next 20 years due to the requirements
of the Regional Spatial Strategy, which presents clear
opportunities as well as challenges.
The Council is working closely with its partners in the Local
Strategic Partnership in order to develop a strong vision for the
area. This will be set out in the Sustainable Community
Strategy. The opportunities and challenges presented by the
growth agenda will be met and delivered through the Core
Strategy.
The ambitions stated in this plan, need to be considered in
conjunction with the resources available to deliver them.
This information is set out in detail in the Financial
Plan.
This Corporate Plan clearly demonstrates what the priorities are
for Bath & North East Somerset Council over the next three
years and how we will deliver improved outcomes for the people we
serve.
2. Purpose
The Corporate Plan sets out Bath and North East
Somerset's principal objectives, identifies issues selected for
improvement (referred to as Improvement Priorities), specifies
targets and the broad strategies and resources required to deliver
these targets. It is intended to be a broad high level
document, with the specific detail of how actions are to be
achieved being contained within Service Plans.
3. Bath & North East Somerset – The Story of
Place
Bath & North East Somerset is a great place
to live, work and visit. Over two thirds of the area is
designated as an Area of Outstanding Natural Beauty and green
belt. The World Heritage City of Bath forms the main urban
conurbation with Keynsham and Midsomer Norton and Radstock being
the other significant areas of population. The rest of the
district consists of small rural communities including 69
villages.
Bath & North East Somerset enjoys a unique quality of built
and natural environment, world-class arts and culture, a relatively
strong economy and low levels of unemployment. The area has
very high levels of educational achievement, low crime levels,
excellent public services and a relatively affluent and healthy
population.
There are a great many positive things about Bath & North
East Somerset. However, a number of challenges have developed
over the last 50 to 100 years bringing the area to a tipping point,
exacerbated by the requirement of the Regional Spatial
Strategy. The principal challenges are set out
below.
Community
Bath & North East Somerset has healthy, safe communities and
overall levels of deprivation are well below the national
average. However, there are pockets of deprivation within the
district. A small number of neighbourhoods feature within the
most deprived 10% in the country, with one featuring in the most
deprived 5%[1] which is in stark contrast to the majority
of the area and results in significant levels of inequality and
impacts adversely on the life chances of the population living in
these areas.
People who live in Bath and North East Somerset continue to
enjoy better than average health compared with the country as a
whole. For the period 2003-2005, life expectancy was significantly
in excess of the national average, although this masks considerable
health inequalities within small pockets of the
community.
Although crime levels are low, fear of crime and anti social
behaviour are priorities for local people. Evidence shows
pockets or “hotspots” of crime in particular localities.
Additionally, there are identifiable “communities of interest”
such as People with Learning Difficulties and some BME communities
who fare significantly less well than mainstream residents with
many of the same deprivation issues as the neighbourhoods described
above.
Narrowing the gap between the most and least affluent is a real
challenge facing the area and impacts on a multitude of factors,
including health, educational achievement and access to
services. This leads to a variety of related issues including
poverty of aspiration within a number of isolated areas.
Addressing inequality is essential in building stronger
communities.
Economy
The economy in Bath & North East Somerset is relatively
strong and recent analysis shows that the direction of travel for
continued economic growth in the area is favourable. There is
a healthy knowledge driven economy, a relatively high level of self
employment and an excellent skills base. About 70% of jobs
are taken by residents therefore suggesting that the local skills
profile does provide sufficient human capital to meet the needs of
the local economy.
However, a lack of historical planning of the economy has
resulted in a heavy reliance on the public and tourism sectors
which in turn has resulted in a low wage economy.
The desirability of Bath & North East Somerset as a place to
live and associated high quality of life has led to very high
housing costs, with the area featuring in the 5% least affordable
housing areas in the country. There are serious shortages of
affordable / key worker housing which, when considering the low
wage economy of the area, presents problems for many people, some
of whom have no choice but to commute to work from outside the
area.
The road and rail network are at capacity and congestion across
the area is a problem in terms of journey times and public
transport travel times, a key impediment to maintaining a healthy
economy. Congestion is also affecting air quality and in
areas of Bath City Centre air pollution has reached levels that are
higher than the Government recommended acceptable limits.
Environment
A high proportion of the area is classed as rural and there are
a large number of thriving villages. The area benefits from
an exceptional natural and built environment with Bath city, as a
designated world heritage site having an exceptionally high quality
built environment. However there has traditionally been a
substantial under investment in the public realm leading to outdoor
spaces and urban environments that need particular attention.
This deters private sector investment which is essential to the
future regeneration of the area.
The requirements for growth contained in the Regional Spatial
Strategy are set to have a substantial impact on the area over the
next 20 years. A growth requirement that equates to building
a new town the size of Keynsham and Radstock combined presents a
major challenge, but also an opportunity to address the shortage of
affordable and key worker housing. However, this growth needs
to be socially, economically and environmentally sustainable and
with the necessary infrastructure in place.
What the Community Has Told Us
In a recent Voicebox[2] Survey conducted on local
residents, the level of traffic congestion in the area was
identified as the top issue in need of improving by respondents
with 44% identifying it as their top priority. Road and
pavement repairs also ranked highly, lending weight to this as an
improvement priority. Activities for teenagers
was the second highest priority, identified by 35% of
respondents. Affordable housing, the level of crime, public
transport, cleanliness of streets and the level of pollution also
featured in the list of priorities identified.
Going Forward
The lack of affordable housing, low wage economy and congestion
problems leads to a local economy that is unsustainable without
major investment and a diversification of the economic base.
These are undisputedly priorities for the area and have been
identified strongly through consultation with local
residents.
For the establishment and maintenance of sustainable
communities, inequalities must be addressed and the disadvantaged
and vulnerable protected.
Additionally, the causes and effects of climate change are
becoming increasingly important and will need to be fully
considered in all plans and strategies for the future.
Bath & North East Somerset is a great place to live, work
and visit. It is recognised that there are a number of
challenges facing the area, however, there are also significant
opportunities to address these issues especially through the growth
agenda.
[1] Source: Department of
Communities and Local Government, Indices of Deprivation
2007. Particular super output areas in Bath & North
East Somerset feature in the most deprived 10% areas in specific
domains. One features in the most deprived 5% for a
specific domain. For full details, refer to the Indices of
Multiple Deprivation 2007.
[2] Residents survey conducted
in Bath & North East Somerset in 2007 with 5000+
responses. Data available to ward level.
4. Our Vision
Careful consideration of the economic,
environmental and social factors that will help shape Bath &
North East Somerset over the coming years has allowed an
aspirational vision for the area to be developed. Our vision
is:
Making Bath & North East Somerset an even better place to
work, live and visit
Specifically, this means that Bath & North East Somerset
is a distinctive place with vibrant communities where
everyone fulfils their potential.
We are therefore working towards:
1. A distinctive place that has:
- Outstanding built and natural environment
- A dynamic economy
- Connectivity
- World class arts and culture
2. With vibrant sustainable communities
- That are active, lively and inclusive
- Where people feel safe, take responsibility and make a
contribution,
- That are carbon neutral,
- Where the disadvantaged are supported
- Where the vulnerable are protected
- Where people feel proud to live
3. Where everyone fulfils their potential by
having an equal opportunity to:
- Learn and develop skills
- Enjoy a healthy lifestyle
- Influence the future of their area
- Contribute to the economy and society
Bath & North East Somerset Council’s core values for moving
towards this vision are: quality, value with customer
focus.
5. Our Priorities
The vision for Bath & North East
Somerset Council will drive local plans and policies and ensure
that the future of Bath & North East Somerset is a sustainable
one.
Underpinning the vision, are the Council’s improvement
priorities for the next three years:
- Improving transport and the public realm
- Building communities where people feel safe and secure
- Addressing the causes and effects of climate change
- Improving the availability of affordable housing
- Promoting the independence of older people
- Improving the life chances of disadvantaged children and young
people
- Improving school buildings
- Sustainable growth
For each improvement priority, the plan below sets out the
priority actions either underway or planned during the life of the
Corporate Plan. Detailed information underpinning the
priorities can be found in the relevent service and financial
plans.
The performance indicators contained in the National Indicator
Set are also aligned to each improvement priority. These
performance indicators will be used to monitor our progress in
delivering the priorities alongside other relevent locally set
indicators. This list will be refined as the Local Area
Agreement for Bath & North East Somerset is refreshed.
More detailed local indicators that help support the improvement
priorities can be found in service plans.
Improving Transport and the Public
Realm
Our Transport Vision
http://www.westofengland.org/downloads/Our_Future_Transport_October_2007.pdf
explains how we and our West of England partners will address
congestion, access and air quality issues over the next 20
years. Government funding and support has been agreed in
principle for £110millilon of improvements through 2 major schemes
- the Greater Bristol Bus Network and the Bath Transportation
Package. Five other sub-regional schemes are in
preparation. The Greater Bristol Bus Network and the Bath
Package are at an advanced stage and they will improve bus routes,
Park & Rides, accessibility, bus frequency, pedestrian access
and information across the sub-region. Further investment
bids will be pursued in 2008/09 for implementation over the next
5/10 years.
Transport improvements go hand in hand with enhancements to our
public realm and the Future for Bath & North East Somerset
document.
http://www.bathnes.gov.uk/future/Bath/A+Spatial+Framework/Living+heritage.htm
explains how we plan to invest in simple, high quality, pedestrian
friendly public spaces.
Over the next 3 years priority actions to deliver this
improvement priority are:
1. Achieve “full consent” status for Bath’s Transportation
Package so we can deliver:
- A new Park & Ride site and expansion to our current
sites
- New Bus Rapid Transit between Newbridge through the city
and to the East of Bath
- Showcase bus routes
- Parking & travel information systems
- Pedestrian & access improvements
2. Prepare a full business case for submission of a £840million
Transport Innovation Fund bid for transforming transport provision
in Bath and the sub region
3. Improved effectiveness of Home to School Transport for
eligible children and young people
4. Community reparations work by young offenders
5. Creative use of our commercial estate and section 106
agreements to release capital for improvements to the public
realm
6. Use of CIVITAS and New Growth Points funding to improve city
signage and to test new ways of improving air quality and more
sustainable travel
|
List of Indicators from National Indicator
Set |
|
NI 167 Congestion – average journey time per mile during the
morning peak |
|
NI 168 Principal roads where maintenance should be
considered |
|
NI 169 Non-principal roads where maintenance should be
considered |
|
NI 175 Access to services and facilities by public transport,
walking and cycling |
|
NI 176 Working age people with access to employment by public
transport (and other specified modes) |
|
NI 177 Local bus passenger journeys originating in the authority
area |
|
NI 195 Improved street and environmental cleanliness (levels of
graffiti, litter, detritus and fly posting) |
|
NI 198 Children travelling to school – mode of travel usually
used |
Building Communities Where People Feel
Safe and Secure
Crime in Bath & North East Somerset is low by comparison to
many other areas. However crime, and in particular the fear
of crime, has a significant impact on communities and
individuals. The Council will continue to work with all its
partners - notably the Police - to address specific pockets of high
crime, and to target specific types of crime where these are local
priorities, including tackling domestic violence, addressing
anti-social behaviour and reducing the impact of drugs and alcohol
on communities.
The Council will pay particular attention to reducing the impact
of crime and the fear of crime on how people live their lives. For
example, tackling hate crime means addressing the current low
levels of reporting, so raising awareness is therefore a key
element of this work.
As a member of the Community Safety Partnership, the Council has
a significant role in supporting communities to tackle local issues
as well as making sure that its services – in particular those
associated with the appearance of neighbourhoods - are delivered
well. The Council will also use its licensing powers to achieve its
overall aims.
Over the next 3 years, the priority actions to deliver this
improvement priority will be:
- Developing further the PACT (Partners and Communities Together)
meetings with the Police and others to empower local community
groups to address and resolve issues which are important to
them
- Implementing our new Neighbourhood structures so that our
environmental services are aligned more closely with partners;
services. This means we can respond even more quickly to
local concerns about the Council’s key areas of responsibility -
such as litter and graffiti
- More “Deep Clean Keep Cleans” and “Environmental Action Days”
which focus the work of public services on getting things done
locally: A recent Deep Clean Keep Clean in Keynsham saw litter bins
replaced, litter cleared up and 95% of the “target area”
deep-cleaned
- Increasing the quality of parks and open spaces - for example,
working with local communities to achieve 7 "Green Flag"
awards
- Extend our work with other agencies, including the Courts, to
provide greater support for victims of domestic violence and abuse,
and bring more offenders to justice
- Working with the Police to reduce offences associated with the
“night-time economy”- for example continuing our marshalling
schemes
- Improving the effectiveness of drug and alcohol treatment –
with a fivefold increase in the treatment available for alcohol
misuse
- Increased targeting of Youth Service support to hot
spots
|
List of Indicators from National Indicator
Set |
|
NI 16 Serious acquisitive crime rate |
|
NI 17 Perceptions of anti-social behaviour |
|
NI 19 Rate of proven re-offending by young
offenders |
|
NI 20 Assault with injury crime rate |
|
NI 30 Re-offending rate of prolific and priority
offenders |
|
NI 32 Repeat incidents of domestic violence |
|
NI 40 Drug users in effective
treatment |
Addressing the causes and effects of
Climate Change
The Council's primary focus has been on managing waste.
Over the period of the corporate plan, the Council will broaden its
approach to include reducing its own carbon footprint and providing
leadership for the area to reduce its carbon footprint (including
its approach to transport) and build resilience to unavoidable
climate change.
Over the next 3 years priority actions to deliver this
improvement priority are:
1. To reduce the Council’s carbon emissions by 2% per annum
by:
- Implementing Our Big Energy Challenge to reduce energy
consumption in public and voluntary sector buildings across the
district by 10% by 2010
- Implementing improved in-house recycling
- Implementing flexible location working for our staff
- Making changes in our capital programme for new build and
adaptations of current assets to achieve lower or zero
carbon emissions from buildings
- Reduced emissions from all our new vehicles
- Where possible sourcing our food products locally
2. To raise awareness about how the community can reduce their
carbon footprint and apply influence to achieve reductions in
emissions
3. Review planning processes and ensure that the new Local
Development Framework contains policies that will deliver the
government’s target for all new homes to be zero carbon by 2016
4. Continue to work towards our aspiration of ‘zero waste’,
through action and education to reduce waste production, as well as
increase recycling
- Sustaining and improving our excellent track record in
recycling as one of the top Unitary Councils
- Reach agreement on sub-regional waste solutions
- Introduce food waste collections throughout the
district
5. Following the LGA Climate change commission report, the
Council will review in the light of the report:
- Its planning processes and building standards;
- Its sustainable procurement policies
|
List of Indicators from National Indicator
Set |
|
NI 185 CO2 reduction from Local Authority
operations |
|
Ni 186 Per capita CO2 emissions in the LA area |
|
NI 187 Tackling fuel poverty – people receiving income based
benefits living in homes with a low energy efficiency
rating |
|
NI 188 Adapting to climate change |
|
NI 191 Residual household waste per head |
|
NI 192 Household waste recycled and composted |
|
NI 193 Municipal waste land filled |
|
NI 194 Level of air quality – reduction in NOx and primary PM10
emissions through local authority’s estate and
operations. |
|
NI 197 Improved local biodiversity – active management of local
sites |
Improving the availability of
affordable housing
The Affordable Housing Delivery Plan aims to increase the
availability of affordable housing that “meets the needs of those
who cannot afford to secure decent housing on the open market
either to rent or buy” by focusing attention on six key priority
areas:
-
Planning
-
Land
-
Funding
-
Tenure
-
Sustainability
- Cross-authority and Partnership working
Over the next 3 years priority actions to deliver this
improvement priority are:
- Delivering the first stage of major affordable housing schemes
in Keynsham and Bath
- Getting the most from section 106 agreements through 35%
affordable housing requirement
- Improve access to housing for vulnerable people both through
mainstream social housing and the commissioning of specific housing
schemes
- Grant & low cost loans to improve poor private sector
housing
- Prevention of homelessness (reducing demand on social housing)
by - Supporting access into private sector housing using the
deposit bond scheme and Ensuring the Supporting People
Programme targets helping vulnerable people to sustain their
tenancies
|
List of Indicators from National Indicator
Set |
|
NI 125 Achieving independence for older people through
rehabilitation/intermediate care |
|
NI 139 The extent to which older people receive the support they
need to live independently at home |
|
NI 143 Offenders under probation supervision living in settled
and suitable accommodation at the end of their order or
licence |
|
NI 145 Adults with learning disabilities in settled
accommodation |
|
NI 147 Care leavers in suitable accommodation |
|
NI 149 Adults in contact with secondary mental health services
in settled accommodation |
Promoting the independence of older
people
The relationship between health, social care and wider community
services will be integral to the creation of a high quality care
system which is fair; accessible and responsive to the individual
needs of those who use services and their carers.
People, irrespective of illness or disability, are supported to:
live independently; stay healthy and recover quickly from illness;
exercise maximum control over their own life and where appropriate
the lives of their family members; participate as active and equal
citizens, both economically and socially; have the best possible
quality of life; retain maximum dignity and respect.
Our work will shift the balance of services away from heavy
dependence on acute care to provide more and better preventative
health, supported living and social care in the
community.
Over the next 3 years priority actions to deliver this
improvement priority are:
- Continue to exceed the Government guidance on concessionary
fares for older and disabled people (we start at 9am, Govt guidance
states 9:30am) These concessions are also available on our
Park & Ride schemes
- Expand our 3 successful dial a ride schemes for residents who
cannot easily access scheduled bus routes
- To commission an increased range of housing and supported
living options for older people including older people with mental
health problems, learning difficulties and physical and / or
sensory impairment
- More older people supported to live independently in a home of
their choice, including older people with learning difficulties and
dementia
- Fewer inappropriate referrals to sheltered housing and
residential care, fewer hospital admissions and delayed
discharges
- Increased range of community based support services for people
with dementia
- Develop ‘access to physical care and therapy’ protocol for
people in mental health in-patient beds
- Increase availability of prevention and healthy living options
e.g. balance classes, falls prevention work
- Merger of Community Team for Older People and Intake &
Re-enablement teams to develop Intermediate Care Service
- Consolidate and develop services which prevent admission to
hospital and facilitate early discharge
- Commission day service providers for new community resource
centres with a focus on those with high physical care need and
dementia
- Increase choice and control through roll out of individual
budgets
- Open next 2 community resource centres: extra care flats;
dementia day centres; residential care
- Completion of restructuring of domiciliary care: assessment and
re-enablement service & re-commissioned long term
provision
- Community Teams Project: with the Primary Care Trust integrate
community health care provision and social care teams
|
List of Indicators from National Indicator
Set |
|
NI 125 Achieving independence for older people through
rehabilitation / intermediate care |
|
NI 131 Delayed transfers of care from hospitals |
|
NI 139 People over 65 who say that they receive the information,
assistance and support needed to exercise choice and control to
live independently |
|
NI 141 Number of people achieving independent living (main
target in JA submission) |
Improving the life chances of
disadvantaged children and young people
This entails targeting effort and resources on those at most
risk of under achievement and reducing the ‘gap’ between key groups
and the wider population of children and young people. Good
progress has been made during 2006-07 and 2007-08, this will
continue into 2008-09.
Over the next 3 years priority actions to deliver this
improvement priority are:
- Increase attainment / achievement of key groups of Black and
other Minority Ethnic Children and Young People by 50%
- Increase attainment / achievement of Children in Care by
50%
- Implement “Aim Higher for Disabled Children” and improve
community and respite facilities
- Provide a stronger focus on improving attainment / achievement
in areas of deprivation using our Children’s Centres to target
young children at risk of under achievement
- Engage Children and Young People, Parents and Carers in the
development and design of services through implementing our
participation strategy
Improving School Buildings
The Council has a proven track record in the delivery of new
schools and substantial refurbishments. Our aim moving
forward is to seek out resources to improve upon this record and
provide the learning facilities that our Children and Young People
deserve.
Over the next 3 years priority actions to deliver this
improvement priority are:
- Complete review of secondary school provision and staff
consultation on changes
- Rebuild Writhlington School
- Rebuild St. Keyna Primary School
- Complete phase 2 build of Fosse Way School
- Agree primary priorities and align capital grant to deliver
these
- Agree secondary priorities and align capital grant to deliver
these
- Promote early ‘BSF’ bid to the Government
- Continue investment in Early Learning / Childcare and community
facilities
|
List of Indicators from National Indicator
Set |
|
NI 54 Services for disabled children |
|
NI 62 Stability of placements of looked after children: number
of moves |
|
NI 69 Children who have experienced bullying |
|
NI 70 Hospital admissions caused by unintentional and deliberate
injuries to children and young people |
|
NI 72 Achievement of at least 78 points across the Early Years
Foundation Stage with at least 6 in each of the scales in Personal
Social and Emotional Development and Communication, Language and
Literacy (Statutory) |
|
NI 73 Achievement at level 4 or above in both English and Maths
at Key Stage 2 (Threshold) (Statutory) |
|
NI 74 Achievement at level 5 or above in both English and Maths
at Key Stage 3 (Threshold) (Statutory) |
|
NI 75 Achievement of 5 or more A*-C grades at GCSE or equivalent
including English and Maths (Threshold) (Statutory) |
|
NI 92 Narrowing the gap between the lowest achieving 20% in the
Early Years Foundation Stage Profile and the rest
(Statutory) |
|
NI 101 Children in care achieving 5 A*-C GCSEs (or equivalent)
at Key Stage 4 (including English and Maths)
(Statutory) |
|
NI 107 Key Stage 2 attainment for Black and minority ethnic
groups |
|
NI 108 Key Stage 4 attainment for Black and minority ethnic
groups |
|
NI 111 First time entrants to the Youth Justice System aged 10 –
17 |
Sustainable Growth
Bath and North East Somerset lies within a growth area defined
by government and articulated through the Regional Spatial
Strategy. The Council wishes to positively contribute to the
growth of the West of England whilst maintaining the
distinctiveness of the places that make up the district.
Bath and North East Somerset has been defining the unique added
value that we can offer the sub region. The challenge is
housing growth at rate of more than three times historic provision
within a constrained and designated built and natural
environment. Economically the District is diverse but for
each place economic diversification and growth is
necessary.
The combination of employment diversification and housing
provision has to address the infrastructure provision in order to
reduce congestion, improve housing affordability and drive
competitiveness. For growth to be truly sustainable the
Council has committed to engage with communities and partners in
regular dialogue to hear views before decisions are
taken.
Over the next 3 years priority actions to deliver this
improvement priority are:
- Produce a Core Strategy and Site Allocations Development Plan
Document
- Prepare Regeneration Delivery Plans for the urban areas that
set out actions required to implement development and regeneration
on key sites
- Develop a sub regional Programme of Development which clarifies
infrastructure requirements necessary to accommodate the housing
growth
- Complete a Business Growth and Employment Land Study that
provides evidence about the current economy, identifies future land
and premises requirements and identifies target growth sectors
- Protect strategic employment sites and seek to allocate and
deliver new employment space
- Attract infrastructure funding and investment from developers,
government and agencies that will enable and unlock growth (e.g.
Growth Area funding)
- Work with the Universities to maximise innovation and spin-off
business opportunities to create new jobs
- Collaboration with business support agencies, the business
community and education providers to continue to provide business
support to promote indigenous growth
- Target key sectors (e.g. ICT and Creative Industries) through
indigenous expansion and an Inward Investment Strategy (with sub
regional partners)
- Deliver a successful partnership with business groups through a
City Centre Manager and Limited Company to deliver destination
management improvements
|
List of Indicators from National Indicator
Set |
|
NI 151 Overall employment rate |
|
NI 152 Working age people on out of work benefits |
|
NI 153 Working age people claiming out of work benefits in the
worst performing neighbourhoods |
|
NI 161 Learners achieving a Level 1 qualification in
literacy |
|
NI 162 Learners achieving an Entry Level 3 qualification in
numeracy |
|
NI 163 Working age population qualified to at least Level 2 or
higher |
|
NI 164 Working age population qualified to at least Level 3 or
higher |
|
NI 165 Working age population qualified to at least Level 4 or
higher |
|
NI 166 Average earnings of employees in the area |
|
NI 170 Previously developed land that has been vacant or
derelict for more than 5 years |
|
NI 171 VAT registration rate |
|
NI 172 VAT registered businesses in the area showing
growth |
|
NI 173 People falling out of work and on to incapacity
benefits |
|
NI 174 Skills gaps in the current workforce reported by
employers |
|
NI 182 Satisfaction of businesses with local authority
regulation services |
|
NI 183 Impact of local authority regulatory services on the fair
trading environment |
|
NI 184 Food establishments in the area which are broadly
compliant with food hygiene law |
Continue to 6. Value for Money, Resouces and